Notes
Blog
November 16, 2026
Bifacial vs monofacial modules: what satellite imagery can (and can't) tell youRGB satellite imagery won't show cell structure or backsheet. Here's what a module count can verify, and what still belongs to the schedule.
November 16, 2026
Field notes: the draw request that counted perfectly and still didn't add upA module count that matched the EPC's number to the panel, and a draw that still got kicked back. What the count alone never tells you.
November 9, 2026
Verifying an as-built panel count against an interconnection capacity milestoneHow lenders and asset owners reconcile an as-built module count against an interconnection agreement MW milestone before releasing a draw.
November 2, 2026
Field notes: the week the clouds beat the quarterA field-notes look at what happens when cloud cover eats the tasking window and a draw verification has to wait on the weather.
November 2, 2026
How many modules fit on a standard tracker table?There's no single answer. Tracker table module counts depend on module size, 1P vs 2P configuration, and row length. Here's how to read it.
October 26, 2026
How to cross-check an EPC's monthly progress report against a module tallyHow to reconcile an EPC's self-reported percent complete against an independent counted module tally before approving a construction draw.
October 26, 2026
What a lender's independent engineer report covers in solar financeA plain explanation of what the IE report does in a solar construction loan, what it checks each month, and where its blind spots sit.
October 19, 2026
Central inverter vs string inverter: telling them apart in overhead imageryHow to tell central and string inverters apart in VHR imagery, and why the difference matters when counting inverters for a milestone check.
October 19, 2026
Field notes: the quarter the module count outran the draw scheduleA field-notes look at the quarter an EPC's draw request lagged behind the as-built module count, and why an independent count still mattered.
October 14, 2026
Racked tables vs. installed modules: reading a solar site from aboveHow to tell empty racking from mounted modules in VHR satellite imagery, and why the difference matters for a construction draw.
October 14, 2026
What counts as substantial completion on a solar construction loanHow substantial completion is defined in solar construction loan agreements, why it differs from COD, and what lenders check before releasing a draw.
October 13, 2026
How many solar modules are in a megawatt?A quick breakdown of modules per MW DC, why the number moves with wattage class, and why it matters for verifying a draw against the schedule.
October 13, 2026
Inverter count vs module count: which one actually proves a solar milestoneModule count tracks DC-side racking. Inverter count tracks AC readiness. Here's which one your draw schedule should be tied to, and when you need both.
October 8, 2026
Staged pallets vs. installed modules: reading a solar site from overheadHow to tell staged module pallets from mounted panels in VHR imagery, by row geometry, shadow pattern, and racking context, not color.
October 8, 2026
Percent complete vs. percent installed: verifying an EPC draw requestEPC draw requests report percent complete. Your loan agreement probably needs percent installed. Here's how to check which one you're getting.
October 8, 2026
Module count vs. nameplate capacity: what a draw request should showWhy nameplate capacity isn't a field count, and what documentation a construction draw request should include to back it up.
October 8, 2026
String count vs. module count: which one proves construction progress?String count and module count measure different things. Here's why conflating the two can mislead a construction draw request.