A lender's draw package shows a module count and a module type: bifacial, 650W, on single-axis trackers. The question that comes up every quarter is whether that distinction can be confirmed from imagery before the money moves. A satellite pass can confirm the count. It can't confirm the module technology, and that limit changes what you should be asking the count to do.
Why the imagery can't sort them
Bifacial and monofacial modules look almost identical from directly overhead. Both are dark rectangular panels mounted in rows on racking or trackers. The feature that makes a module bifacial, a transparent or semi-transparent backsheet that lets light reach the rear cells, is not something a nadir RGB capture at VHR resolution (≤0.3 m GSD) can resolve. You're looking at a reflective glass surface from above, not the cell layer underneath it. Even at ground level, telling the two apart usually means walking up and checking the back of a module for a frame-and-glass sandwich versus a solid polymer sheet. From a satellite pass, that detail simply isn't there to capture.
Some people assume bifacial arrays sit higher off the ground or carry wider row spacing to let reflected light reach the rear cells, and on paper that's often true. In practice, row pitch and mounting height vary enough by racking vendor, tracker model and site-specific ground cover ratio that you can't treat spacing as a reliable fingerprint. A fixed-tilt monofacial array on a site with generous land can have wider rows than a tightly packed bifacial tracker site two counties over. Pattern-matching on spacing alone gets you a guess, not a verification.
What the count verifies
This is where the job description matters. A counted inventory of modules, tables and inverters has one job: compare what's physically on the racking this quarter against what the schedule says should be there by this point in construction. Module technology is a separate fact, carried by the procurement BOM and the interconnection filing, not inferred from pixels.
If the schedule calls for 42,000 modules at a named bifacial part number and the counted inventory comes back at 31,000 installed, that 11,000-module gap is the number a lender acts on. The module type is a document fact, confirmed by the equipment schedule and the interconnection filing. The count is a progress fact, confirmed by VHR imagery each quarter. Keeping those two separate is what makes the verification hold up: imagery isn't asked to do a job it can't do, and the schedule isn't asked to do the counting.
Reading layout clues instead of guessing
Where imagery genuinely helps on the bifacial question is indirect. A site under construction with trackers already installed and large sections of exposed, reflective racking (no groundcover yet, or a gravel or light-colored surface prepared underneath) is consistent with a bifacial design intended to capture rear-side albedo. That's a supporting observation for a site walk or an engineer's review, not a standalone ID. Table layout, row count and tracker orientation are things a counted inventory can confirm reliably and tie back to the as-built drawing set. Module technology stays a documentation question, checked against the schedule rather than guessed from above.
For a lender comparing an EPC's self-reported percent-installed against reality, the equipment schedule carries the bifacial-or-monofacial fact, and a quarterly count of modules, tables and inverters carries the how-many-are-installed fact. That's the comparison Solar Panel Counting is built to deliver: an independently counted number set against the draw or interconnection schedule, not a claim about what the imagery can see that it can't.
If your next draw request leans on a percent-installed figure you'd rather not take on faith, that's the gap this count is meant to close.